W.W. Construction, LLC

Public Projects
Current Projects are in bold: 
USACE
  • Taft High School, Utilities, Lincoln City OR
  • Waldport Athletic Complex, Earth work, Waldport OR
  • Waldport Elementary School, Utilities Waldport OR
  • HMSC Effluent Disinfection Improvements, South Beach OR
  • Post offices in Toledo and Siletz, OR
  • City of Toledo Downtown Streetscape
  • City of Newport Nye Beach Rebuild

7945 NE Avery, PO Box 1150 Newport OR 97365 P: 541-265-7090 F: 541-265-7099
12783 LaSalle St, Boise, ID 83711 PO Box 4312, Boise, ID 83711 P: 208-375-5397
CCB#66680 RCE-39356 DUNS #: 624168753 CAGE Code: 3B9B7 
USDA-FS
  • ​CLPUD Northern Operations Center, Newport, OR
  • RSCI Wills Pump Station, Twin Falls Idaho
  • Seal Rock Water District, 143rd Street Waterline Replacement 
  • Yaquina Bay Seawall, Rip Rap Placement, Newport OR
  • Port of Toledo Dike Removal, Toledo OR
  • ODOT-Sand Lake Road Drainage, Pacific City, OR 
  • Federal Hwy Administration. ERFO multiple road repairs
  • Oregon State Highway Department. Clarence Creek Slide repair, Hwy 101 MP 78 Slide Repair
  • BLM. Past culvert replacement contract and current N.W. Oregon IDIQ culvert replacement contract
  • Contracts and Emergency Repairs for the City of Newport, Toledo, Waldport, Yachats and Seal Rock.
  • ​Teepee Spring BAER Road Reconstruction-Phase I,Riggins Idaho
  • Dorena Potable Waterline and Pump house Replacement- Siuslaw National Forest
  • Six Shooter Site Preparations-Emmett Ranger District, Boise National Forest
  • Road 51 Legacy Culvert Replacement
  • Abbott Creek Bridge Rehabilitation  
  • Cascade Head Interpretative Site Enhancements, Otis, OR
  • USDA Forest Service, Numerous fish passage and road repair contracts.
NOAA
  • USACE Coos Bay Dock Repair
  • Bonneville Dam Navlock Replacement- fabrication and installation of a mooring dolphins and three (3) 110 ft by 36” pilings

USCG
  • ​BOA- Fence Repair, Florance
  • BOA- Fence Repair, Depoe Bay
  • Maintenance Dredging at Station Cape Disappointment, Ilwaco,WA 
NPS
  • Lewis & Clark National Historic Park Aggregate Walkway Restoration
  • Chiller Replacement, South Beach, OR
USDA-ARS
  • Irrigation Pipeline Replacement , Kimberly Idaho
Oregon Air National Guard
  • Kingsley Field, Repair Base Waterlines, Klamath Falls, OR
BLM
  • Alsea and Yamhill Culvert Replacements
  • NIFC Campus Sanitary Sewer Mod., Boise, ID
  • Nestucca Emergency Culvert Repair